PROJECTS EXECUTED
Elite Canada > PROJECTS EXECUTED
Working with OOREDOO since 2016:
☛ On-going OSP (outside premises maintenance work) with Ooredoo
Qatar, Civil activates (laying duct & repairing, duct blockage removal).
☛ Trench Excavation & deep excavation works for new ducts laying &
JRC’s. Test pits to clear the blockage.
☛ D54 & D56 duct laying & JRC14, JRC12 & JRC4 construction works.





Working with Vodaphone since 2018:
☛ Cable Pulling & installation at Vodaphone’s network.
☛ FTTH indoor structure cabling & IBS networks in High rise buildings
in Pearl Qatar.
☛ Jointing, Splicing, Termination & testing as per Vodaphone
standards.











IBS
(GSM Civil Works / Installations / Technical
Services & Solutions)
Site Preparation and permits
o Excavation and foundation
o Tower Installation & GSM Rooftop
o Foundation Concrete pouring
o Fence installation
o Shelter installation, Outdoor & Indoor solutions
o Tower Erection and Painting
o ODU/Shelter Construction
o Rooftop Beam Layout
o Rooftop Beam Connection Details
o Module Installation
o Cable Organizing Trays & Cable Routing
o Cable Labels
o Small Cell Tower (Huawei)
o IBS Cable Installation & Testing
GSM / Rooftop & Greenfield


IBS In building Installations & Solution
IBS-Equipment Room

Indoor Cables & Antenna Installation

Indoor Structure Cable Services & Solution
Computer Networking
o Backbone Cabling Solution
o Telecommunication Space Solution
o Horizontal Cabling Solution
o Work Space Solution

Turnkey Projects: Kahramaa Project GTC-350/10
o Complete construction of 46 Nos. Of standard indoor & new
outdoor substations with AALCO. Since 2005 to onward.
Excavation & Cable Pulling Work
o Supply to Doha South Sewage Treatment Works at Musaimeer
(Kahramaa Scheme # 91402/2011)
o Complete excavation, HV cable pulling & backfilling works of 6500.00
L.M. of HV cable with AL-Ajjaj Limited Company
Mirrich Contracting
o Complete excavation, cable ducting & backfilling works


Gulf Ware Housing Company’s Project (LVQ Phase – 02)
o Complete construction of 09 Nos. Of typical indoor substations
with 05 Nos. of generator rooms during September 2011 to
January 2012 with AALCO
Villa at Dafna area
o Construction of complete G+1 villa for Mr. Ahmed Saleh Muhammad
Al-Sheeb at Dafna area
Gulf Ware Housing Company’s Project (LVQ Phase – 04)
o Complete construction of 11 Nos. Of typical indoor substations with
07 Nos. of generator rooms during December 2013 to April 2014 with
AALCO.
CCC / TCC
o Completed 400 Live House Connection for Sewerage water
o Completed 4 KM Ooredoo ducting including Building JRC 12 & 14
Road & Allied Works
o Mowasalat
o Construction of asphalt road & interlock paving work at Mowasalat
mechanical work shop area
State Masjid at Al-Kuwair area
o Lying of External basalt 19,000.00 SQM at State Mosque, with
Contraco W.L.L.

Qatar University
o Fixing of interlock paving 13,600.00 SQM at Qatar University
Government Schools
o Fixing of interlock paving 11230.00 SQM in different schools with
SATCO Int’l

Supply to Residential Compound of International Housing Group (Ezdan)
at Al Wukair (Kahramaa Scheme number 14-404-2011 & 14-405-2011)
o Complete excavation, Cable pulling & backfilling works of 3010.00
L.M. of HV & MV cable with AL-Ajjaj Limited Company.
DI Pipe Works
Kahramaa’s Project GTC 467 with AALCO
o 400mm, 300mm, 200mm & 150 mm DI pipe wrapping, laying, fitting &
testing for 10.3 km for Al-Ajjaj Limited Company during April 2013 to August
2013.
Tayseer Contracting Company W.L.L / Consolidate Contractor Group
S.A.L (Offshore)(CCC)-JV
o Project- IA/13-14 C 06ST, For Roads & Infrastructure in Rawdat aba Heeran(
MMUP Ph2, Pkg-8) DW015- Package 02. ( Foul Sewer House
Connection).325- House Connections completed in 2018-2019.
Consolidates Contractor Group S.A.L / Tayseer Contracing Co. WLL
o Foul Sewer House Connection & Drainage Works Project- DW015-Package -2
580 House Connections completed in 2018-2019.
Al Khayarin, KG Electromec
o Doha & Rayyan Sewerage Scheme Sewer extension & house connection
works (PWA/STC/36) – Job # 564/2017. 50- House Connections completed in
2017-2018.
Alwaha Contracting & Trading Co. W.L.L
o Construction of PS70 area sewerage-phase4, Civil Project- CP 745/4.
The construction of the House connection stage II, by breaking septic tank
roof, cleaning, Excavation, extend pipes & installation inspection chamber
“prefabricated” or Cast institute then back filling & reinstatements as per
existing. 950 Home House Connections completed in 2016-2017.
CGC –SACYR Joint Venture. Combine Group Company for Trading &
Contraction W.L.L
o (House Connection Work) C2013/19.
o Public Work Authority, Roads & infrastructure in Bani Hajer North. (Rawadat
Egdaim) Phase 1& 2 Package 1. 175- House Connections completed in 2017.
Mechanical & Civil Engineering Contractors Company (MACE- LLC)
o Project # GTC-5 SR HS 14, for Excavation up to 80cm, Pipe Lying, Surround
FTB, Gully
Different Photos During Activities & After Completio